{"id":2257,"date":"2014-03-11T14:02:36","date_gmt":"2014-03-11T12:02:36","guid":{"rendered":"http:\/\/fkh.ch\/en\/dienstleistungen\/pruefung-von-hs-betriebsmitteln-vor-ort\/gis\/"},"modified":"2019-11-28T13:26:29","modified_gmt":"2019-11-28T12:26:29","slug":"gis","status":"publish","type":"page","link":"https:\/\/fkh.ch\/en\/dienstleistungen\/pruefung-von-hs-betriebsmitteln-vor-ort\/gis\/","title":{"rendered":"Testing of gas-insulated switchgear (GIS)"},"content":{"rendered":"<div id=\"attachment_1343\" style=\"width: 310px\" class=\"wp-caption alignright\"><a href=\"https:\/\/fkh.ch\/wp-content\/uploads\/2014\/07\/A12-088-Bg-SIL-220kV-GIS-Banlieu-Ouest-UHF-TE.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-1343\" class=\"wp-image-1343 size-medium\" src=\"https:\/\/fkh.ch\/wp-content\/uploads\/2014\/07\/A12-088-Bg-SIL-220kV-GIS-Banlieu-Ouest-UHF-TE.jpg\" alt=\"GIS test setup on a 123 kV system\" width=\"300\" height=\"225\" srcset=\"https:\/\/fkh.ch\/wp-content\/uploads\/2014\/07\/A12-088-Bg-SIL-220kV-GIS-Banlieu-Ouest-UHF-TE.jpg 3648w, https:\/\/fkh.ch\/wp-content\/uploads\/2014\/07\/A12-088-Bg-SIL-220kV-GIS-Banlieu-Ouest-UHF-TE-300x225.jpg 300w, https:\/\/fkh.ch\/wp-content\/uploads\/2014\/07\/A12-088-Bg-SIL-220kV-GIS-Banlieu-Ouest-UHF-TE-768x576.jpg 768w, https:\/\/fkh.ch\/wp-content\/uploads\/2014\/07\/A12-088-Bg-SIL-220kV-GIS-Banlieu-Ouest-UHF-TE-1024x768.jpg 1024w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-1343\" class=\"wp-caption-text\">GIS test setup on a 123 kV system<\/p><\/div>\n<p>Substations are important network nodes that must provide high availability. The projected service life of gas-insulated switchgear (GIS) is 35 &#8211; 50 years, during which its insulation system has to withstand all voltage loads without maintenance.<\/p>\n<p>According to the latest fault statistics from CIGRE (International Council on Large Electric Systems), the target set by the IEC (International Electrotechnical Commission) of less than 0.001 faults per year for a system&#8217;s insulation has still not been attained. These statistics also indicate that about 50% of dielectric faults occurring during operation were already present when the systems were commissioned. This results in a requirement for more careful and stringent testing in the factory and \u2013 in particular \u2013 on site.<\/p>\n<p>As an independent institution, FKH has carried out state-of-the-art GIS testing since the 1980s; it also undertakes research and participates in publication activities and other work related to this subject in international specialist bodies. Thanks to its neutral stance, FKH can assess failures without conflicts of interest on the basis of transparent measurements.<\/p>\n<p>&nbsp;<\/p>\n<h3>Reasons for performing high-voltage tests and diagnostic measurements and their benefits<\/h3>\n<p>Insulation diagnosis (such as a partial discharge measurement) will typically be carried out on GIS in the following cases:<\/p>\n<ul>\n<li>When a new system is commissioned (as part of the voltage testing)<\/li>\n<li>When systems are extended \u2013 after accidents<\/li>\n<li>Following activation of partial discharge monitoring systems (in-service measurements in some cases)<\/li>\n<li>After weak points have been identified<\/li>\n<li>To determine the condition of the insulation (old systems, in-service measurements)<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<div id=\"attachment_1423\" style=\"width: 310px\" class=\"wp-caption alignright\"><a href=\"https:\/\/fkh.ch\/wp-content\/uploads\/2014\/03\/P1130426.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-1423\" class=\"wp-image-1423 size-medium\" src=\"https:\/\/fkh.ch\/wp-content\/uploads\/2014\/03\/P1130426.jpg\" alt=\"High-voltage test and partial discharge measurement on a medium-voltage GIS\" width=\"300\" height=\"225\" srcset=\"https:\/\/fkh.ch\/wp-content\/uploads\/2014\/03\/P1130426.jpg 2560w, https:\/\/fkh.ch\/wp-content\/uploads\/2014\/03\/P1130426-300x225.jpg 300w, https:\/\/fkh.ch\/wp-content\/uploads\/2014\/03\/P1130426-768x576.jpg 768w, https:\/\/fkh.ch\/wp-content\/uploads\/2014\/03\/P1130426-1024x768.jpg 1024w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-1423\" class=\"wp-caption-text\">High-voltage test and partial discharge measurement on a medium-voltage GIS<\/p><\/div>\n<div id=\"attachment_1422\" style=\"width: 310px\" class=\"wp-caption alignright\"><a href=\"https:\/\/fkh.ch\/wp-content\/uploads\/2014\/07\/P1240804-e1404975786741.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-1422\" class=\"wp-image-1422\" src=\"https:\/\/fkh.ch\/wp-content\/uploads\/2014\/07\/P1240804-e1404975786741.jpg\" alt=\"Multi-channel UHF partial discharge analyser\" width=\"300\" height=\"225\" srcset=\"https:\/\/fkh.ch\/wp-content\/uploads\/2014\/07\/P1240804-e1404975786741.jpg 2000w, https:\/\/fkh.ch\/wp-content\/uploads\/2014\/07\/P1240804-e1404975786741-300x225.jpg 300w, https:\/\/fkh.ch\/wp-content\/uploads\/2014\/07\/P1240804-e1404975786741-768x576.jpg 768w, https:\/\/fkh.ch\/wp-content\/uploads\/2014\/07\/P1240804-e1404975786741-1024x768.jpg 1024w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-1422\" class=\"wp-caption-text\">Multi-channel UHF partial discharge analyser<\/p><\/div>\n<p>The usual test procedures are as follows (IEC):<\/p>\n<ul>\n<li>AC voltage test<\/li>\n<li>Partial discharge measurement<\/li>\n<li>Lightning surge test<\/li>\n<\/ul>\n<p>FKH assists its customers with all aspects, including GIS insulation tests, and offers support and advice throughout the entire project:<\/p>\n<ul>\n<li>Test specifications for tenders, including placement of UHF sensors<\/li>\n<li>Testing instructions (e.g. for the high-voltage acceptance test)<\/li>\n<li>Performance of all insulation tests on high-voltage switchgear<\/li>\n<li>\u00a0Integral tests with connected high-voltage cables are also possible<\/li>\n<li>Diagnosis and root cause analysis, including in-service assessment<\/li>\n<li>Expert opinions<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<h3><\/h3>\n<div id=\"attachment_1424\" style=\"width: 310px\" class=\"wp-caption alignright\"><a href=\"https:\/\/fkh.ch\/wp-content\/uploads\/2014\/03\/P1240352-e1404978476795.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-1424\" class=\"wp-image-1424 size-medium\" src=\"https:\/\/fkh.ch\/wp-content\/uploads\/2014\/03\/P1240352-e1404978476795.jpg\" alt=\"On-site testing of a 380 kV GIS; voltage generated via a resonant circuit\" width=\"300\" height=\"225\" srcset=\"https:\/\/fkh.ch\/wp-content\/uploads\/2014\/03\/P1240352-e1404978476795.jpg 2000w, https:\/\/fkh.ch\/wp-content\/uploads\/2014\/03\/P1240352-e1404978476795-300x225.jpg 300w, https:\/\/fkh.ch\/wp-content\/uploads\/2014\/03\/P1240352-e1404978476795-768x576.jpg 768w, https:\/\/fkh.ch\/wp-content\/uploads\/2014\/03\/P1240352-e1404978476795-1024x768.jpg 1024w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-1424\" class=\"wp-caption-text\">On-site testing of a 380 kV GIS; voltage generated via a resonant circuit<\/p><\/div>\n<h3><b><\/b>Measurement and testing options<\/h3>\n<ul>\n<li>AC voltage test with series-resonant systems<\/li>\n<li>Conventional partial discharge measurements as per IEC<\/li>\n<li>UHF partial discharge measurement, including the sensitivity verification as per CIGRE. The most sensitive of all UHF partial discharge measurement methods is used:<br \/>\nnarrow-band measurement with visual selection of the measurement frequency, together with a 50\u00a0dB pre-amplifier directly on the UHF PD sensor. In particular, this method allows detection of critical faults with a very low partial discharge amplitude (e.g. particles on insulation material) that could lead to a breakdown during operation in case of transient stress (e.g. lightning).<\/li>\n<li>Lightning surge tests (with oscillatory surges where appropriate)<\/li>\n<li>Localisation of test breakdowns with a breakdown localisation system<\/li>\n<li>Localisation and identification of partial discharge findings by:\n<ul>\n<li>Rough localisation via partial discharge frequency spectra and GIS sectioning<\/li>\n<li>Signal arrival-time-based PD location with state-of-the-art oscilloscopes<\/li>\n<li>Acoustic partial discharge measurement using ultrasonic sensors<\/li>\n<li>Video endoscopy with remote-controlled swivelling cameras inserted in the GIS<\/li>\n<li>Microscopy and characterisation of particles\/findings<\/li>\n<\/ul>\n<\/li>\n<li>Assessment of findings<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<h3><\/h3>\n<h3>Fault types<\/h3>\n<p>The application of test methods is merely one aspect of testing. When diagnosing dielectric faults (especially during a partial discharge measurement), the test engineer&#8217;s experience plays a critical part in ensuring an efficient and effective test procedure. Expert assessment of partial discharge occurrences, elimination of the partial discharge source and consideration of the need for further investigations may all be decisive factors in preventing future GIS failures.<\/p>\n<div id=\"attachment_4259\" style=\"width: 1034px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/fkh.ch\/wp-content\/uploads\/2018\/10\/Fehlertypen_GIS.png\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-4259\" class=\"wp-image-4259 size-large\" src=\"https:\/\/fkh.ch\/wp-content\/uploads\/2018\/10\/Fehlertypen_GIS.png\" alt=\"Types of insulation fault on a GIS\" width=\"1024\" height=\"425\" srcset=\"https:\/\/fkh.ch\/wp-content\/uploads\/2018\/10\/Fehlertypen_GIS.png 1480w, https:\/\/fkh.ch\/wp-content\/uploads\/2018\/10\/Fehlertypen_GIS-300x124.png 300w, https:\/\/fkh.ch\/wp-content\/uploads\/2018\/10\/Fehlertypen_GIS-768x319.png 768w, https:\/\/fkh.ch\/wp-content\/uploads\/2018\/10\/Fehlertypen_GIS-1024x425.png 1024w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><p id=\"caption-attachment-4259\" class=\"wp-caption-text\">Types of insulation fault on a GIS<\/p><\/div>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/fkh.ch\/wp-content\/uploads\/2019\/11\/GIS-Pr\u00fcfungen-V19-01eng.pdf\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-5025\" src=\"https:\/\/fkh.ch\/wp-content\/uploads\/2019\/10\/GIS-Pr\u00fcfungen-Bildeng.png\" alt=\"\" width=\"106\" height=\"150\" srcset=\"https:\/\/fkh.ch\/wp-content\/uploads\/2019\/10\/GIS-Pr\u00fcfungen-Bildeng.png 794w, https:\/\/fkh.ch\/wp-content\/uploads\/2019\/10\/GIS-Pr\u00fcfungen-Bildeng-212x300.png 212w, https:\/\/fkh.ch\/wp-content\/uploads\/2019\/10\/GIS-Pr\u00fcfungen-Bildeng-768x1086.png 768w, https:\/\/fkh.ch\/wp-content\/uploads\/2019\/10\/GIS-Pr\u00fcfungen-Bildeng-724x1024.png 724w\" sizes=\"auto, (max-width: 106px) 100vw, 106px\" \/><\/a><a href=\"https:\/\/fkh.ch\/wp-content\/uploads\/2019\/11\/GIS-Pr\u00fcfungen-V19-01eng.pdf\">Broschure Testing of gas-insulated switchgear (GIS)<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Substations are important network nodes that must provide high availability. The projected service life of gas-insulated switchgear (GIS) is 35 &#8211; 50 years, during which its insulation system has to withstand all voltage loads without maintenance. According to the latest fault statistics from CIGRE (International Council on Large Electric Systems), the target set by the [&hellip;]<\/p>\n","protected":false},"author":194,"featured_media":0,"parent":2254,"menu_order":20,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-2257","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Testing of gas-insulated switchgear (GIS) - FKH<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/fkh.ch\/en\/dienstleistungen\/pruefung-von-hs-betriebsmitteln-vor-ort\/gis\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Testing of gas-insulated switchgear (GIS) - FKH\" \/>\n<meta property=\"og:description\" content=\"Substations are important network nodes that must provide high availability. The projected service life of gas-insulated switchgear (GIS) is 35 &#8211; 50 years, during which its insulation system has to withstand all voltage loads without maintenance. According to the latest fault statistics from CIGRE (International Council on Large Electric Systems), the target set by the [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/fkh.ch\/en\/dienstleistungen\/pruefung-von-hs-betriebsmitteln-vor-ort\/gis\/\" \/>\n<meta property=\"og:site_name\" content=\"FKH\" \/>\n<meta property=\"article:modified_time\" content=\"2019-11-28T12:26:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/fkh.ch\/wp-content\/uploads\/2014\/07\/A12-088-Bg-SIL-220kV-GIS-Banlieu-Ouest-UHF-TE.jpg\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/fkh.ch\/en\/dienstleistungen\/pruefung-von-hs-betriebsmitteln-vor-ort\/gis\/\",\"url\":\"https:\/\/fkh.ch\/en\/dienstleistungen\/pruefung-von-hs-betriebsmitteln-vor-ort\/gis\/\",\"name\":\"Testing of gas-insulated switchgear (GIS) - FKH\",\"isPartOf\":{\"@id\":\"https:\/\/fkh.ch\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/fkh.ch\/en\/dienstleistungen\/pruefung-von-hs-betriebsmitteln-vor-ort\/gis\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/fkh.ch\/en\/dienstleistungen\/pruefung-von-hs-betriebsmitteln-vor-ort\/gis\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/fkh.ch\/wp-content\/uploads\/2014\/07\/A12-088-Bg-SIL-220kV-GIS-Banlieu-Ouest-UHF-TE.jpg\",\"datePublished\":\"2014-03-11T12:02:36+00:00\",\"dateModified\":\"2019-11-28T12:26:29+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/fkh.ch\/en\/dienstleistungen\/pruefung-von-hs-betriebsmitteln-vor-ort\/gis\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/fkh.ch\/en\/dienstleistungen\/pruefung-von-hs-betriebsmitteln-vor-ort\/gis\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/fkh.ch\/en\/dienstleistungen\/pruefung-von-hs-betriebsmitteln-vor-ort\/gis\/#primaryimage\",\"url\":\"https:\/\/fkh.ch\/wp-content\/uploads\/2014\/07\/A12-088-Bg-SIL-220kV-GIS-Banlieu-Ouest-UHF-TE.jpg\",\"contentUrl\":\"https:\/\/fkh.ch\/wp-content\/uploads\/2014\/07\/A12-088-Bg-SIL-220kV-GIS-Banlieu-Ouest-UHF-TE.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/fkh.ch\/en\/dienstleistungen\/pruefung-von-hs-betriebsmitteln-vor-ort\/gis\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\/\/fkh.ch\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Services\",\"item\":\"https:\/\/fkh.ch\/en\/dienstleistungen\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"High Voltage Testing\",\"item\":\"https:\/\/fkh.ch\/en\/dienstleistungen\/pruefung-von-hs-betriebsmitteln-vor-ort\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Testing of gas-insulated switchgear (GIS)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/fkh.ch\/en\/#website\",\"url\":\"https:\/\/fkh.ch\/en\/\",\"name\":\"FKH\",\"description\":\"High Voltage Testing and Engineering Commission\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/fkh.ch\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Testing of gas-insulated switchgear (GIS) - FKH","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/fkh.ch\/en\/dienstleistungen\/pruefung-von-hs-betriebsmitteln-vor-ort\/gis\/","og_locale":"en_US","og_type":"article","og_title":"Testing of gas-insulated switchgear (GIS) - FKH","og_description":"Substations are important network nodes that must provide high availability. The projected service life of gas-insulated switchgear (GIS) is 35 &#8211; 50 years, during which its insulation system has to withstand all voltage loads without maintenance. According to the latest fault statistics from CIGRE (International Council on Large Electric Systems), the target set by the [&hellip;]","og_url":"https:\/\/fkh.ch\/en\/dienstleistungen\/pruefung-von-hs-betriebsmitteln-vor-ort\/gis\/","og_site_name":"FKH","article_modified_time":"2019-11-28T12:26:29+00:00","og_image":[{"url":"https:\/\/fkh.ch\/wp-content\/uploads\/2014\/07\/A12-088-Bg-SIL-220kV-GIS-Banlieu-Ouest-UHF-TE.jpg","type":"","width":"","height":""}],"twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/fkh.ch\/en\/dienstleistungen\/pruefung-von-hs-betriebsmitteln-vor-ort\/gis\/","url":"https:\/\/fkh.ch\/en\/dienstleistungen\/pruefung-von-hs-betriebsmitteln-vor-ort\/gis\/","name":"Testing of gas-insulated switchgear (GIS) - FKH","isPartOf":{"@id":"https:\/\/fkh.ch\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/fkh.ch\/en\/dienstleistungen\/pruefung-von-hs-betriebsmitteln-vor-ort\/gis\/#primaryimage"},"image":{"@id":"https:\/\/fkh.ch\/en\/dienstleistungen\/pruefung-von-hs-betriebsmitteln-vor-ort\/gis\/#primaryimage"},"thumbnailUrl":"https:\/\/fkh.ch\/wp-content\/uploads\/2014\/07\/A12-088-Bg-SIL-220kV-GIS-Banlieu-Ouest-UHF-TE.jpg","datePublished":"2014-03-11T12:02:36+00:00","dateModified":"2019-11-28T12:26:29+00:00","breadcrumb":{"@id":"https:\/\/fkh.ch\/en\/dienstleistungen\/pruefung-von-hs-betriebsmitteln-vor-ort\/gis\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/fkh.ch\/en\/dienstleistungen\/pruefung-von-hs-betriebsmitteln-vor-ort\/gis\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/fkh.ch\/en\/dienstleistungen\/pruefung-von-hs-betriebsmitteln-vor-ort\/gis\/#primaryimage","url":"https:\/\/fkh.ch\/wp-content\/uploads\/2014\/07\/A12-088-Bg-SIL-220kV-GIS-Banlieu-Ouest-UHF-TE.jpg","contentUrl":"https:\/\/fkh.ch\/wp-content\/uploads\/2014\/07\/A12-088-Bg-SIL-220kV-GIS-Banlieu-Ouest-UHF-TE.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/fkh.ch\/en\/dienstleistungen\/pruefung-von-hs-betriebsmitteln-vor-ort\/gis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/fkh.ch\/en\/"},{"@type":"ListItem","position":2,"name":"Services","item":"https:\/\/fkh.ch\/en\/dienstleistungen\/"},{"@type":"ListItem","position":3,"name":"High Voltage Testing","item":"https:\/\/fkh.ch\/en\/dienstleistungen\/pruefung-von-hs-betriebsmitteln-vor-ort\/"},{"@type":"ListItem","position":4,"name":"Testing of gas-insulated switchgear (GIS)"}]},{"@type":"WebSite","@id":"https:\/\/fkh.ch\/en\/#website","url":"https:\/\/fkh.ch\/en\/","name":"FKH","description":"High Voltage Testing and Engineering Commission","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/fkh.ch\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/fkh.ch\/en\/wp-json\/wp\/v2\/pages\/2257","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fkh.ch\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/fkh.ch\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/fkh.ch\/en\/wp-json\/wp\/v2\/users\/194"}],"replies":[{"embeddable":true,"href":"https:\/\/fkh.ch\/en\/wp-json\/wp\/v2\/comments?post=2257"}],"version-history":[{"count":7,"href":"https:\/\/fkh.ch\/en\/wp-json\/wp\/v2\/pages\/2257\/revisions"}],"predecessor-version":[{"id":5915,"href":"https:\/\/fkh.ch\/en\/wp-json\/wp\/v2\/pages\/2257\/revisions\/5915"}],"up":[{"embeddable":true,"href":"https:\/\/fkh.ch\/en\/wp-json\/wp\/v2\/pages\/2254"}],"wp:attachment":[{"href":"https:\/\/fkh.ch\/en\/wp-json\/wp\/v2\/media?parent=2257"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}